NOTE: These signs are likely standard European road signs. Explanation of signs is approximate. UPDATE @ 4 AM EDT, June 20th: Gord has a link to offical (design-like, not actual) images of British road signs. http://www.highwaycode.gov.uk/signs_index.htm [CONFIRMED] Tag refers to that webpage. UPDATE @ 9:30 PM EDT, June 20th: I found an image on the Scotland government's website which showed an example of 2-4. Updated and [CONFIRMED] This file originally created by AndyTheGeeky, last edited by: AndyTheGeeky (replace this name with your own) Last edit: 2:05 PM EDT June 20th NOTE TO NEXT EDITOR: Place an "UPDATED:" line below the previous line with the signs you changed or confirmed Line 1: 12 signs SIGN 1: Dual carriage way ends [CONFIRMED] so... divider ends? SIGN 2: lane merge from left SIGN 3: Two-way traffic straight ahead [CONFIRMED] SIGN 4: No U-Turns [CONFIRMED] SIGN 5: Crossroads [CONFIRMED] SIGN 6: CANNOT READ SIGN 7: CANNOT READ SIGN 8: No motor vehicles [CONFIRMED] SIGN 9: SIGN 10: Stop sign Sign 11: see 7 Sign 12: see 5 Line 2: 16 signs SIGN 1: Steep hill downwards [CONFIRMED] SIGN 2: Two lanes going same direction Sign 3: see 1-4 SIGN 4: Tourist Information Point/Centre [CONFIRMED] SIGN 5: T-junction [CONFIRMED] Sign 6: see 1-5 SIGN 7: SIGN 8: SIGN 9: NOT A T-intersection? Sign 10: see 1-1 Sign 11: see 2 Sign 12: see 1-6 Sign 13: see 1-4 SIGN 14: CANNOT READ SIGN 15: Give priority to oncoming vehicles [CONFIRMED] SIGN 16: Road narrows on both sides [CONFIRMED] Line 3: 14 signs Sign 1: see 2-8 Sign 2: see 2-14 Sign 3: see 1-9 SIGN 4: Stay in lane, 2 lane crossover at contraflow road works [CONFIRMED] Sign 5: see 2-9 Sign 6: see 1-1 Sign 7: see 1-9 Sign 8: see 2-2 Sign 9: see 2-7 Sign 10: see 2-15 SIGN 11: Bend to right [CONFIRMED] SIGN 12: No right turn [CONFIRMED] Sign 13: see 4 Sign 14: see 2-1 Line 4: 3 signs Sign 1: see 2-7 Sign 2: see 1-4 SIGN 3: Staggered junction [CONFIRMED] so, same road on either side Line 5: 8 signs Sign 1: see 1-1 Sign 2: see 1-2 Sign 3: see 2-5 Sign 4: see 1-3 SIGN 5: Sign 6: see 2-8 Sign 7: see 3-4 Sign 8: see 5 Line 6: 9 signs Sign 1: see 1-8 SIGN 2: CANNOT READ: campground? SIGN 3: No goods vehicles over maximum weight shown [CONFIRMED] 7.5 Metric Tons? Sign 4: see 1-6 SIGN 5: one way, going right SIGN 6: CANNOT READ Sign 7: see 1-4 Sign 8: see 5-5 SIGN 9: Parking [CONFIRMED] Line 7: 15 signs Sign 1: see 2-9 Sign 2: see 2-5 Sign 3: see 2-2 Sign 4: see 1-1 SIGN 5: Give Way(Yield) Sign 6: see 2-2 Sign 7: see 5-5 Sign 8: see 1-6 Sign 9: see 5-9 Sign 10: see 1-1 Sign 11: see 1-9 Sign 12: see 1-1 again Sign 13: see 1-9 again, repetition for emphasis perhaps? Sign 14: see 2-5 Sign 15: see 1-8 Line 8: 5 signs Sign 1: see 1-1 Sign 2: see 1-7 Sign 3: see 2-4 Sign 4: see 1-6 Sign 5: see 1-1 Line 9: 4 signs, perhaps a signature? Sign 1: see 1-2 Sign 2: see 2-15 Sign 3: see 3-4 SIGN 4: Traffic has priority to oncoming traffic [CONFIRMED] Similar to 2-15. one being agent, other being handler?